Insulated Foundation System on Rathmullan House

The fully insulated Kore foundation has been completed on site. The system provides a U-Value of .11W/m2K and is free of cold bridges. The system reduces both time on site and the quantity of concrete required. The reinforced concrete slab was poured recently.

IMG_0046.JPG